Outsourcing of key Oil & Gas Operations staff such as Production Supervisors, Production Operators, Technicians, Welders, Mechanics, etc.

OCTG Procurement

OCTG Procurement

This project involved the procurement, importation and logistics of casing and tubings for a marginal field operator.

OML 26: NPDC/FHN Crude Evacuation

OML 26: NPDC/FHN Crude Evacuation

This project involved the strategic planning, scheduling and execution of an alternate means of transporting export quality crude after undergoing wet crude dehydration processes and system as designed by our technical team. This was achieved using creative inland and marine logistics solutions.

Modular Gas Plant

Modular Gas Plant

Funtay was in charge of FEED, EPC, Installation, and O&M of three Joule Thompson gas plant with a combined capacity in excess of 21 MMSCF/D to extract heavier hydrocarbons from a gas stream. The operations and maintenance of this Gas Plant is currently managed by

CNG Plant in Delta State

CNG Plant in Delta State

This project is located in Matsogo Oil Field. The CNG plant was designed to offtake natural gas from the production facility using gas virtual pipeline. The project involved the installation of CNG Compressors, Scrubbers, gas meters, a loading bay, and electrical room, gas generators, and

Igbolo-1: EPF Engineering Procurement & Construction

Igbolo-1: EPF Engineering Procurement & Construction

Igbolo-1 field is located in Etua, Delta State. This project involved providing all conceptual designs, layout design, sizing, procurement, FEED, installation of equipment, commissioning as well as Operation and Maintenance for the Early Production Facility. The Early Production Facility engineered by Funtay can handle about

Chorus Energy Igbolo -1 Re-Entry

Chorus Energy Igbolo -1 Re-Entry

This field is located in Delta State. The project involved drilling out cement plugs, cement retainer, and bridge plug; running and cementing of casing, wellbore cleaning, perforation of hydrocarbon and single string completion. Funtay’s rig was deployed for this project and Funtay was involved in

Matsogo 1 Reentry and Work Over- Chorus Energy

Matsogo 1 Reentry and Work Over- Chorus Energy

This project is located at Matsogo, Delta State. It involved the re-entry and initial completions of a gas-condensate well within the marginal field. Our specific roles and responsibilities of the project includes but not limited to well engineering services, drilling supervision, general project management, front