Funtay Group — Reservoir to market
Funtay operations

Nigeria · Reservoir to market

From reservoir
to market.

An indigenous Nigerian energy group operating the full value chain: subsurface evaluation, drilling, gas processing, CNG, and marine logistics — turning E&P assets into revenue.

3Owned rigs
14+Clients across value chain
>20MMSCF/DGas facility built

The Funtay chain

One operator across five stages

Funtay runs its solution in-house end to end, where the timeline and cost are optimised.

Stage 01

Reservoir

Subsurface review, asset maturation and development concepts.

Stage 02

Wells

Rig operations, workover, well testing and start-up.

Stage 03

Processing

Early production facilities, gas processing, CNG or LNG.

Stage 04

Evacuation

Crude handling, marine logistics and gas transport.

Stage 05

Market

Offtake structuring, gas-to-power and industrial customers.

Why Funtay

Expertise in marginal field and offshore assets

Where others see unproductive assets, we see production upside. Our model is a non-conventional phased development and a shorter path to first oil.

3

Drilling & workover rigs

Owned rigs for workover, re-entry, fishing and completions.

2.4+ MMSCF/D

CNG cascade supply capacity

Gas supply capacity by virtual pipeline solutions.

>20MMSCF/D

Gas facility built

Gas processing plants in the Niger Delta.

14+ clients

Delivered across the chain

Upstream, midstream, downstream and power.

Capabilities

What we bring to a joint venture

Upstream

Rig operations & well delivery

Drilling support, well testing, completions and production operations.

Upstream

Early production facilities

Modular well processing and production facilities built for rapid deployment.

Midstream

LPG & CNG processing

Gas conditioning, liquids recovery and compressed gas for industrial offtake.

Midstream

Crude & marine logistics

Evacuation, storage and marine handling as an alternative to pipelines.

Downstream

Refining & topping plants

Modular refining routes that place value closer to the wellhead.

Power

Gas-to-power solutions

Embedded generation and gas supply for industrial users and clusters.

Technical

Project management, FEED & O&M

Front-end engineering and delivery management from concept to handover.

Advisory

Marginal field development consultancy

Re-engineering the development case for marginal fields or fields with difficult economics.

People

Manpower & operations

Qualified Nigerian technical crews for sustained field operations.

Clients

Companies we have worked for

A selection of the operators, majors and industrial customers we have delivered for.

Client logo
Client logo
Client logo
Client logo
Client logo
Client logo
Client logo
Client logo
Client logo
Client logo

Services

Five service lines, one group

Each line stands on its own and they are routinely combined on a single asset — the reason Funtay can take a field from first rig to first offtake.

01

Upstream, midstream & downstream

Efficient drilling, EPF services and project management across the energy value chain — focused on monetising hydrocarbon assets from exploration through processing and evacuation.

  • Subsurface evaluation
  • Drilling & rig services
  • Field development
  • Well intervention / workover
  • Asset development
  • EPCI
  • Integrated project management
  • Casing & tubular fishing
02

Gas services

Reservoir-to-market gas solutions — CNG or LNG through to gas-to-power — for cleaner, more efficient commercialisation of Nigeria’s gas.

  • CNG & LNG bulk & retail
  • Gas power generation
  • Gas development & commercialisation
  • O&M of production facilities
  • Modular gas plants
03

AutoGas

Conversion of cars, buses, trucks and tricycles to CNG as a low-cost, cleaner fuel — with conversion centres, kits and full after-sales behind it.

  • AutoGas conversions
  • Vehicle & generator conversion
  • Conversion centres / workshops
  • AutoGas dispensing skids & stations
04

Power services

Gas-fired generation for real estate, industry and under-served areas — harnessing Nigeria’s gas reserves to close the power gap where the grid falls short.

  • Mini-grid power supply
  • Off-grid & captive power
  • Modular gas turbine plants (1–5MW)
  • Hybrid solar integration
  • Gas-to-power consultancy
05

Marine services

Cost-effective marine and logistics for onshore and offshore producers — moving crude from land and swamp assets to offshore terminals.

  • Alternate crude evacuation
  • Alternate gas evacuation
  • Crude storage & barging
  • FPSO solutions

Track record

Projects we have delivered

Selected work across Upstream, Midstream, Downstream, Power, Gas and Marine.

01

Heirs Oil & Gas

EPC & FEED · Port Harcourt

Engineering, procurement, construction and operation of a 20,000 barrel/day crude evacuation facility — processing, loading gantry and gas-truck logistics keeping the client producing through pipeline outages.

02

NNPC–FHN JV

Alternative crude evacuation · Delta

Alternate export-crude route from a Delta flow station to an FPSO, cutting losses from pipeline vandalism.

03

Chorus Energy

Marginal field asset development · Delta

Full-lifecycle asset development of OML 56 — from subsurface evaluation, to workover, to production, to gas monetisation.

04

Eba Field

Field development · Ogun

Project management for the Eba well re-entry — planning and coordinating the re-entry programme to restore production from the existing wellbore and bring the field back onstream.

05

Summit Oil / Sunterra

Drilling & workover · Edo

Our 1,000 HP rig delivered the workover and re-entry of Otein-1 (OML 142) for the Summit–Sunterra JV, enabling the well to produce over 15 MMSCF/D of gas.

06

NIPCO

Virtual pipeline · Delta

CNG plant of up to 5 MMSCF/D capacity — a virtual pipeline moving gas to market without pipeline infrastructure.

07

Coca-Cola (NBC)

CNG supply · Oyo

Supply of compressed natural gas to Coca-Cola’s Asejire plant for on-site power generation that keeps production running independent of the grid.

08

NNPC Retail

AutoGas conversion · Abuja

Delivered the conversion of NNPC petrol fleets — Toyota Hilux, Corolla and Hyundai Accent — to AutoGas, cutting fuel costs and emissions while proving CNG as a practical automotive fuel.

09

Ondo State Government

AutoGas conversion & station

Converted a government fleet — Toyota Corolla, Hilux, Highlander and Hiace buses — to AutoGas and established a dedicated AutoGas refuelling station to keep the fleet fuelled.

10

Aradel & Waltersmith

HPFO logistics · Imo / PH

Logistics of petroleum products from the refineries to the tank farm.

Quality, health & safety

Built on quality and safety

Funtay’s management systems are in line with ISO 9001 (quality) and ISO 45001 (occupational health & safety) — holding every project and every crew to the same standard from concept to handover, so clients get consistent delivery and a safe worksite.

ISO 9001 · Quality

Documented procedures and records that keep delivery consistent and meet client, statutory and regulatory requirements.

ISO 45001 · Health & safety

A managed approach to hazard control, competence and incident prevention that protects our crews and yours on every site.

Continual improvement

Regular audits and corrective action drive both systems forward and hold performance to account.

Enquiries

Bring us an asset

Hold a marginal field, a flare position or a gas development that needs a solution? Contact us.

Start a conversation

Head office

59 Baderinwa Alabi Street, Lekki Phase 1, Lagos

Enquiries

info@funtay-ng.com

Business development

0802 516 6733

© 2026 Funtay Group. All rights reserved.Lagos, Nigeria