This project involved the procurement, importation and logistics of casing and tubings for a marginal field operator.
This project involved the strategic planning, scheduling and execution of an alternate means of transporting export quality crude after undergoing wet crude dehydration processes and system as designed by our technical team. This was achieved using creative inland and marine logistics solutions.
Convert diesel and petrol powered vehicles to run on Compressed Natural Gas (CNG) or Liquified Natural Gas (LPG). Project is currently ongoing.
Funtay was in charge of FEED, EPC, Installation, and O&M of three Joule Thompson gas plant with a combined capacity in excess of 21 MMSCF/D to extract heavier hydrocarbons from a gas stream. The operations and maintenance of this Gas Plant is currently managed by
This project is located in Matsogo Oil Field. The CNG plant was designed to offtake natural gas from the production facility using gas virtual pipeline. The project involved the installation of CNG Compressors, Scrubbers, gas meters, a loading bay, and electrical room, gas generators, and
The well is located on the eastern part of the Amoji block and was re-entered and drilled with Funtay’s rig to a depth of over 10,000 ft. Funtay was responsible for the entire Asset Development from Re-entry to Production and gas monetization. Funtay enabled the
Igbolo-1 field is located in Etua, Delta State. This project involved providing all conceptual designs, layout design, sizing, procurement, FEED, installation of equipment, commissioning as well as Operation and Maintenance for the Early Production Facility. The Early Production Facility engineered by Funtay can handle about
This field is located in Delta State. The project involved drilling out cement plugs, cement retainer, and bridge plug; running and cementing of casing, wellbore cleaning, perforation of hydrocarbon and single string completion. Funtay’s rig was deployed for this project and Funtay was involved in
This project is located at Matsogo, Delta State. It involved the re-entry and initial completions of a gas-condensate well within the marginal field. Our specific roles and responsibilities of the project includes but not limited to well engineering services, drilling supervision, general project management, front