![Manpower](https://www.funtay-ng.com/wp-content/uploads/2020/03/unnamed-19-330x250.png)
Recent Articles
Writing is a socially acceptable form of schizophrenia
![Manpower](https://www.funtay-ng.com/wp-content/uploads/2020/03/unnamed-19-330x250.png)
![OCTG Procurement](https://www.funtay-ng.com/wp-content/uploads/2020/03/unnamed-9-330x250.jpg)
OCTG Procurement
This project involved the procurement, importation and logistics of casing and tubings for
![OML 26: NPDC/FHN Crude Evacuation](https://www.funtay-ng.com/wp-content/uploads/2020/03/pipeline-i-330x250.jpg)
OML 26: NPDC/FHN Crude Evacuation
This project involved the strategic planning, scheduling and execution of an alternate means
![Vehicles and Generator Conversions](https://www.funtay-ng.com/wp-content/uploads/2020/03/gas-high-res-330x250.jpg)
Vehicles and Generator Conversions
Convert diesel and petrol powered vehicles to run on Compressed Natural Gas (CNG)
![Modular Gas Plant](https://www.funtay-ng.com/wp-content/uploads/2020/03/plant-330x250.jpg)
Modular Gas Plant
Funtay was in charge of FEED, EPC, Installation, and O&M of three Joule
![CNG Plant in Delta State](https://www.funtay-ng.com/wp-content/uploads/2020/03/gaz-system-330x250.jpg)
CNG Plant in Delta State
This project is located in Matsogo Oil Field. The CNG plant was designed
![OML 56: Amoji Well Re-entry and Work over in Niger Delta](https://www.funtay-ng.com/wp-content/uploads/2020/03/slide-1-330x250.jpg)
OML 56: Amoji Well Re-entry and Work over in Niger Delta
The well is located on the eastern part of the Amoji block and
![Igbolo-1: EPF Engineering Procurement & Construction](https://www.funtay-ng.com/wp-content/uploads/2020/03/540edb492cddda70250e7d12ba0792e9-330x250.jpeg)
Igbolo-1: EPF Engineering Procurement & Construction
Igbolo-1 field is located in Etua, Delta State. This project involved providing all
![Chorus Energy Igbolo -1 Re-Entry](https://www.funtay-ng.com/wp-content/uploads/2020/03/1200z740_1573090278_shutterstock_588495665-330x250.jpg)
Chorus Energy Igbolo -1 Re-Entry
This field is located in Delta State. The project involved drilling out cement
![Matsogo 1 Reentry and Work Over- Chorus Energy](https://www.funtay-ng.com/wp-content/uploads/2020/03/0-8-330x250.jpeg)
Matsogo 1 Reentry and Work Over- Chorus Energy
This project is located at Matsogo, Delta State. It involved the re-entry and
![OPL 205: Workover & Completions](https://www.funtay-ng.com/wp-content/uploads/2020/03/Introduction-to-Downstream-330x250.jpeg)
OPL 205: Workover & Completions
Funtay owned 1,000 HP dual ram BOP rig was mobilized for Fishing, Well
![Nigerian Gas Flare Commercialization Program (NGFCP)](https://www.funtay-ng.com/wp-content/uploads/2018/08/mafssa-330x250.jpg)